Industrial Injection 99.5-02 AE Ford/Nav Powerstroke Stock Injector (#8 Cyl Long Lead Only)

Industrial Injection 99.5-02 AE Ford/Nav Powerstroke Stock Injector (#8 Cyl Long Lead Only)

Regular price $274.55 USD
Regular price Sale price $274.55 USD
Industrial Injection
Looking for the lowest price?

Give us a call to get the best prices and parts for your build. Or, just call us with a cool racing story...either way we're here.

INDAEPS
Looking for the lowest price?

Give us a call to get the best prices and parts for your build. Or, just call us with a cool racing story...either way we're here.

Out of stock
Fuel Injectors - Diesel
Industrial Injection 99.5-02 AE Ford/Nav Powerstroke Stock Injector (#8 Cyl Long Lead Only)
Read more
Found a better price elsewhere?
secure-payments
View full details
Free S&H Over $100 to Lower 48 Freight Items & Fluids Only Exception
Easy 30 Days- No Hassle Returns
37,000+ 5 Star Reviews
MFG Fitment Guarantee
Free S&H Over $100 to Lower 48 Freight Items & Fluids Only Exception
Easy 30 Days- No Hassle Returns
37,000+ 5 Star Reviews
MFG Fitment Guarantee

Description

Industrial Injection 99.5-02 AE Ford/Nav Powerstroke Stock Injector (#8 Cyl Long Lead Only)

Unable to find satisfactory answers ?

Testimonials

Looks like I get to be the first review for these guys. Let me start out by saying that I have had 3 other cars of a similar caliber to my GTR serviced/worked on and upgrades installed at other shops and none took the pride and level of detail that these guys did. I wish I could see all the welds on the downpipes and exhaust because it looked like artwork. Their fabricator made sure to send me daily updates and pictures which was also a big deal to me. For being an out of state experience it made it seem more like they were local to me and that I had known them for longer.

- James Lowe

Took the leap of faith on buying a set of their R35 intakes and downpipes because the price was half of anyone elses plus their car hauls a** at the track. Install went smooth and the power seems to be even better than advertised. Cant wait to get tuned in a few weeks. Their shelf tune honestly has to be 600+ hp as I pulled on a Hellcat last night. I see these guys and gals going a long ways if they can get out there and advertise. Customer service is on point paired with BIGGG savings for the winning combo.

- Luca Harris

Bought a Motec and had these guys build the harness and set it up fully. Track car that received the level of attention and detail of a show car while here. Made me feel at home every time I popped in for a visit and always offered to buy me lunch/dinner. I don’t see me shopping anywhere else as they make you feel like your family.

- Richard Westbrook

Took the leap of faith on buying a set of their R35 intakes and downpipes because the price was half of anyone elses plus their car hauls a** at the track. Install went smooth and the power seems to be even better than advertised. Cant wait to get tuned in a few weeks. Their shelf tune honestly has to be 600+ hp as I pulled on a Hellcat last night. I see these guys and gals going a long ways if they can get out there and advertise. Customer service is on point paired with BIGGG savings for the winning combo.

- Luca Harris

Not finding what you're looking for?